Weldment
Weldment basic information:
Sheet Metal Material: Steel
Sheet metal thickness: 6 (mm)
Processing Dimensions / L * W * H: can develop (mm)
Molded parts: Chassis
Cutting way: shears
Tolerance: 0.1
Processing Step: weldment involves processing step of flanging, embedded flanging, bending, reinforcement ribs, stamping, punching, cutting, rounded, shape, expand
Surface treatment: according to customer requirements
Surface roughness: smooth
Proofing time: 4-7 days
Processing time: 4-7 days
Maximum annual processing capacity: 1 million
Applications: Applications welded communications industry, bridges, electricity, industrial equipment, public facilities, and others
Weldment details:
As long as the form of the workpiece is machined welded called weldments. Shanghai Tian Du Bang Hardware Instrument Factory is welded parts and other professional production and processing company, we have a complete and scientific quality management system. Integrity, strength and quality of the field crossing the creek welded metal instrument factory recognized by the industry. Welcome friends to visit, guidance and business negotiation.
Welding parts Show: